Development Roadmap
If anyone has knowledge or information that may improve the simulation, i.e. data, knowledge of behaviors, sounds, access to the aircraft, etc, please contact TOGAsim via private message on x-pilot.com
Not Currently Simulated
Items not currently simulated are items that are slated to be included, but exhibit a development workload/use case ratio that placed these further down the development chain but do not justify the witholding of the rest of the simulation for the majority of customers enjoyment. Rest assured that we have supported and upgraded the MU2 for nearly 16 years and we will continue to improve the simulation to be as accurate as we are able to produce for our customers.
- OEM Variant Weather radar (Pending V12 information)
- Weather Radar is drastically changing for Version 12. Features available to developers to simulate weather radar are unknown at this time and we wish to pause momentarily before determining how much effort we will have to put into developing our own radar display. X-
- Comprehensive SRL (Single Redline System)
- The SRL system uses a proprietary "electronic mapping" to generate the SRL correction signal for the EGT. We are in the processes of empirically establishing this mapping and will provide such in an update. In the meantime, the SRL system is only simulated to conform with nominal procedures, which should be sufficient for 95+% of simulation activities.
- Fuel Enrich
- Fuel enrich is typically used for colder weather operations and sometimes in air starts. Simulating fuel enrich involves implementation of many peripheral engine effects, which is in process. Expect fuel enrich in a future update. Fuel enrich is not utilized for 95%+ of operations. el
Roadmap Items (in no particular order)
-
Hardware setup demonstration videos
-
VR testing
-
XP-12 Porting process
-
More accurate engine sounds, first few seconds/shutdown and flybys
-
Documentation improvement / tutorials
-
More liveries/interiors
-
Shared cockpit support
-
Interactive Fueling / Fueling sequence.
-
Preflight/walk-around sequence
-
Maintenance Reports
-
Failure management and "Systems Challenges"